Construction manager’s field guide
How to Choose Construction Progress Tracking Software
Start with the decision your next progress meeting has to settle. If a subcontractor reports a floor is 80% complete, what would your team need to see before updating the schedule?
Define what your team must be able to do
- Capture the work
- Pick a floor, trade and walk frequency. Who carries the camera? Ask what happens in a dead zone, when the walk uploads, and whether the superintendent can reopen last week’s imagery offline.
- Check a progress claim
- Agree on what counts as installed. Ask how a reviewer can trace a quantity or percent complete back to dated evidence, flag an obscured area and correct an error.
- Update the schedule
- Bring a sample activity ID and your current schedule format. Ask who maps the activity to the work area, what happens after a revision and which changes someone must enter manually. Confirm whether your project needs a BIM model.
- Deliver the report
- Name the recipient, file format and deadline. Receiving a weekly PDF and generating a fresh PDF before an owner meeting are different requirements. Have the vendor demonstrate the one you need.
- Price the whole project
- Request a quote for the same duration, floor area and number of users. Include cameras, setup, training, reporting frequency and access to the records after closeout.
Give every vendor the same field test
Suppose your Friday coordination meeting covers overhead piping on Level 2. Give each vendor the same plan, activity ID and walk photos. Include one bay where the piping is visible and another where the ceiling conceals it.
Ask your superintendent to trace the reported progress for each bay, flag what still needs inspection, then export the owner’s update while you watch. Record who performed each step, what evidence survived in the export and which steps required vendor support.
Explore the approved listings
Use each profile to review the evidence. Take its demo question into your next vendor conversation.
Buildots
Documented 360° capture works with BIM and scheduling data; the AI-assisted PDF workflow is in rollout, and offline viewing is not verified.
Ask in the demo “Can you demonstrate a custom progress PDF using Dot in the plan and project setup we would buy?”
Vendor documentation for BuildotsDoxel
Uses model and schedule inputs; confirm the exact integration exchange and export format.
Ask in the demo “Can you show the progress report and change record after importing a revised schedule?”
Vendor documentation for DoxelOpenSpace Track
OpenSpace documents delivered progress reports; on-demand PDF generation is not verified, and offline Mobile BIM Viewer does not show uploaded imagery.
Ask in the demo “Can you show a delivered PDF progress update and weekly Excel report, and show how both tie back to the schedule?”
Vendor documentation for OpenSpace Track
Which tools meet your requirements?
Choose your must-haves, set your priorities and see which tools have documented support for them. Find My Best Fit is free and requires no sign-in.
Find My Best Fit